Posted on March 25, 2026

This week, we’re excited to bring you an update related to the “convening stair” that will be a new visual focal point in the library tower. As you can see from the photos below, the staircase has been delivered and is in the process of being installed. This staircase is just one example of the plans to make Jackson Library into a more open, natural-feeling space.

The area where the staircase will be installed is being prepped for use.
The new “convening stair” is almost ready for installation.
The future “convening stair” can be seen on the left side of this rendering.

Recent Posts

(from all blogs)

Blogs/News

Comments?